Temporary Wall Systems For Construction
Fast Installation
Quickly deploy temporary construction walls to any job site. Lift-and-drop connection allows 100’ of wall to be installed in an hour.
Durable & Reusable
Reutilize STARC's prefabricated temporary construction walls for multiple projects. Designed for durability, our construction partitions outlast single-use traditional barriers.
Safety Compliant
Maintain a safe and compliant construction site with temporary containment walls designed to control dust and reduce noise by up to 50%. Our walls exceed ICRA Class IV/V and ASTM E84 requirements.
Versatile & Adaptable
Our temporary modular walls adapt to any space, ensuring easy reconfiguration for changing project needs. Ideal for healthcare, airports, data centers, commercial renovations, and more. Choose from 4 unique options.
Why Choose STARC?
Noise Blocking
RealWall™ system features a foam core that reduces noise by up to 50%
Great Looking
Clean white panels blend in with surroundings
Fast Installation
Lift-and-drop connections allows 100' of wall to be installed in an hour
Class A Fire & Smoke Rated
Tested and listed ASTM E-84 Class A performance for fire & smoke spread
Reusable & Waste-Reducing
Durable system can be reused for hundreds of jobs and lasts for years
Cost Savings
Pays for itself in 3 – 5 uses virtually eliminating future containment costs
How much can STARC save you?
STARC'S Premier Containment Options
✓ Projects needing sound attenuation & disruption-free installation
✓ Projects requiring real wall appearance and construction
✓ Long term installations where stability & durability are paramount
✓ Projects needing a great looking lightweight, lower-priced solution
✓ Projects requiring a quick turnaround & frequent reconfiguration
✓ Customers who want superior durability for years of reuse
✓ Exceeds ASTM E119, ASTM E84 and ICRA Class IV requirements
✓ Projects needing one-hour fire-rated temporary containment
✓ Customers who want a reusable, fast-installing and safe solution
STARC Systems is trusted by:
And many more...
Jerry Baker, Executive Director of Construction, W.E. Bowman
Scott Thomas, Director, Special Projects Group, Hourigan
Denise Muth, Healthcare Project Executive,
DPR Construction